![]() |
|
Posted by steamy on September 10, 2002 at 06:10:36:i work 12 hr shifts in a power plant. 4 shifts on 6 days off. 2 night shifts then 2 day shifts. time off is good but always tired, been doing this for 20 yrs. anyone have same schedule, and problems. the quick turnaround shift is a pain in the neck.
- Re: 12 hr shifts GoodSnooz 09:56 10/08/02 (0)
|
Copyright ©1995-2005 Sleepnet.com., All rights reserved